Yangzhou Plum Pipe Co., Ltd. New pipeline hanger production project Environmental impact assessment Public participation in a publicity

Date:2020-10-22 10:14:39

Yangzhou Plum Pipe Co., Ltd. intends to invest 51.8 million yuan in Yizheng City Auto Industrial Park, the new "pipe hanger production project." The relevant information on the environmental impact assessment is carried out according to the relevant provisions of the Interim Measures for Public Participation in Environmental Impact Assessment (State Environmental Protection Administration, Central China [2006] No. 28). Publicity, to seek public views, welcomed the community to actively participate in and supervision.
First, the name and summary of the construction project
      Project Name: New pipeline hanger production project;
      Construction unit: Yangzhou Plum Pipe Rack Co., Ltd.
      Construction site: Yizheng Automobile Industrial Park;
      Project investment: a total investment of 51.8 million yuan;
      Project scale: an annual output of 5,000 tons of pipe support hanger;
      Contact: Huo Jingli;
      Tel: 17766007998.
Second, bear the evaluation of the environmental impact assessment agencies name and contact information
      Name of the unit: Nanjing Branch Hong environmental technology limited liability company;
      Unit qualification: China Central Assessment No. B No. 1980;
      Address: Jijia District, Nanjing Jialing River East Street on the 18th 6, 11;
      Contact: Wei Gong;
      Tel: 025-85280708;
      Fax: 025-68661189;
      E-mail: khhbgy2@163.com.
Third, the environmental impact assessment work procedures and the main content
      (Including environmental monitoring, engineering analysis, environmental impact forecasting evaluation) → report preparation stage (environmental monitoring, project evaluation, environmental impact forecasting evaluation) → report preparation stage (environmental monitoring, Summary of the results of the work, the draft of the draft after the formation of environmental information publicity and public participation in the investigation, report reported review).
      The main contents of EIA work: through engineering analysis, environmental status quo survey, forecast project construction on the project area of ??water, gas, sound, the impact of the soil environment and extent. It puts forward the pollution prevention and control measures such as water, gas, sound, solid waste and soil, so that the social and economic benefits of the proposed project are coordinated with the environment and provide scientific basis for the decision-making of engineering construction and environmental management department.
Fourth, the main issues of public participation
      The evaluation according to the specific circumstances of the construction project, taking into account the scope and extent of environmental impact, the degree of social concern, the main request for the following:
      (1) the public to provide personal accurate information mainly include: name, occupation, education, home address and contact telephone number;
      (2) whether the status of environmental quality is satisfactory;
      (3) whether to know / understand the projects to be built in the area;
      (4) the extent to which the project affects the environment;
      (5) Do you think the construction of the project will promote the development of the local economy;
      (6) what attitude to the project, and a brief description of the reasons;
      (7) What are the recommendations and requirements for environmental protection of the project?
Fifth, the main way of making public opinions
      The public can fax, e-mail, letter to the construction unit, the evaluation unit, the local government and its environmental authorities.
Sixth, the term of this announcement
      This time is 10 working days from the date of publicity.

 Announcement Issued by: Yangzhou Plum Pipe Rack Co., Ltd
                                          April 21, 2017